What conditions must exist for separate contracts to be viable?

Respuesta :

W0lf93
W0lf93 W0lf93
  • 30-01-2018
The owner must be an in house CM or construction engineer to administer the contracts. CM is established as an independent contractor. The CM is responsible to the owner to complete the project by the established substantial completion date and within the agreed budget. The CM must compensate the owner when the construction does not satisfy the established standards of performance for a project.
Answer Link

Otras preguntas

Solve the system of equations: [tex]3x-4y=-23\\2y-x=-19[/tex]
Can somebody help me with this question
find the perimeter of a rectangle with length 210 meters and width 72 meters​
Austin is interested in working for an intelligence branch of the government. A polygraph test is part of the interview process. Though Austin intends to be hon
Find the value of c such that the three points (5,5), (-3,1), and (6,c) lie on the same line. Note: Three points are on the same line if the slope of the line t
what is democracy tell me​
Aphrodite took out a 30-year loan from her bank for $170,000 at an APR of7.2%, compounded monthly. If her bank charges a prepayment fee of 6months' interest on
Igneous : Ignis :: Sedimentary : ______________
someone please help me with this
Arrange the events that led to the September 11 attacks in the correct sequence. Osama bin Laden’s organization of mujahideen fightersrise of the Taliban in Afg