Je8wellieAEtherna Je8wellieAEtherna
  • 17-03-2017
  • Business
contestada

A plan that outlines alternative courses of action is called a(n) ____ plan.

Respuesta :

MissPhiladelphia
MissPhiladelphia MissPhiladelphia
  • 28-03-2017
The appropriate response is a Contingency plan. It is a game-plan intended to help an association react viably to a critical future occasion or circumstance that could possibly happen. Alternate courses of action are regularly formulated by governments or organizations.
Answer Link

Otras preguntas

what do the formation of rust and the formation of cottage cheese have in common
City a has a total population of 10 million, of which 70 percent are adults. assume that 20 percent of the adult population is not looking for a job and 60 perc
a glass of orange juice sitting on a table has motion relative to A. The table B. The earth C. The Sun
On a test, you correctly answer six 5-point questions and eight 2-point questions. You earn 92% of the possible points on the test. How many points p is the tes
What are the most important things of the education reform?
Very confused, would like the answers and an explanation please
What are 2 major factors that increase population size?
increases in industrialization led to which of the following A. The move from urban to rural areas B. An increase in need for agriculture C. The migration from
The midpoint of is y. the length of is 4 centimeters. what is the length of ?a. 4 cm b. 6 cm c. 8 cm d. 10 cm
Why must bacteria have ribosomes when they lack other organelles?