tosaichihussein tosaichihussein
  • 18-09-2022
  • Physics
contestada

How much work is done by an applied mass to lift 55 kg block and 4.5 meter high?

Given=
Unknown=
Formula=
Solution=
Answer=​

Respuesta :

ItzTds
ItzTds ItzTds
  • 18-09-2022

Answer:

Given = 55kg, 4.5 m

Unknown = Work done

Formula = (mg) × d

Solution = 2425.5 J

Answer = 2425.5 J

Explanation:

Formula we use,

→ W = (mg) × d

Then the value of work done is,

→ (55 × 9.8) × 4.5

→ 539 × 4.5

→ 2425.5 J

Hence, the work done is 2425.5 J.

Answer Link

Otras preguntas

Create a list of 10 people you would include on your beginning network contact list. Justify the inclusion of those people you have selected.​
The solution for the following system of linear equation 3m-2n=13 is (2,-1) true or false
which inequality is represented by this graph?
(9-6)+12 what’s is the answer?
4. Find the total area of the four walls of a room 10 m long, 8 m wide and 3 m high.
Indicate the level of measurement being used in the given scenario: A local animal shelter keeps track of the breeds of dogs that come in:_______ a. Nominal b
Collier Chemicals has redesigned many jobs to make the work more interesting and challenging for its employees. The company encourages its employees to further
Simplify to create an equivalent expression. \qquad{8-4(-x+5)}8−4(−x+5)
HELP ASAP! convert to slope-intercept form with steps please :) 6x > 2y = 5
Ram and Shyam shared a secret and promised to eachother that it would remainbetween them. Ram expressed himself in one of the following ways as givenin thechoic