shadobiannahwur shadobiannahwur
  • 20-01-2017
  • Business
contestada

As an r&d manager, how can you reduce material costs?

Respuesta :

MissPhiladelphia
MissPhiladelphia MissPhiladelphia
  • 28-01-2017
As an r&d manager, you can reduce material costs by researching on possible materials to be used for your products that will not affect the quality of the product consequently. Hope this helps. Have a nice day. Feel free to ask more questions.
Answer Link

Otras preguntas

Which energy is necessary to carry out the removal of waste
The volume of a cube is 753.571 cubic inches. What is the length of each side of the cube?
Consent from the victim is not always needed before providing first aid
​Dolbear's law states the relationship between the rate at which Snowy Tree Crickets chirp and the air temperature of their environment. The formula is Upper T
Interest is: A- charge for lending money to a bank B-the amount owed for borrowing money C-the amount added into your savings when opening a bank account D-a ch
Moldy bread! Where did that come from? Moldy bread indicates that a fungus is growing in and on your bread. But how did it get there? The bread was in a plastic
What is the relationship between chemical bonds and energy?
Laticia randomly selected 25% of the seventh grade students in her school and asked them their favorite season.Of the students surveyed ,51 chose summer as thei
What number is 34% of 29.5
In this Reagan quote, the "wall" to which the President refers is located in the city of