natanyaatkinson
natanyaatkinson natanyaatkinson
  • 20-10-2021
  • Mathematics
contestada

The time to complete a project varies inversely with the number of employees. If 3 people can complete the project in 7 days, how long will it take 5 people? ​

Respuesta :

0817312
0817312 0817312
  • 20-10-2021

Answer:

17 days

Step-by-step explanation:

Answer Link

Otras preguntas

Fill the plastic bottle to the b rim with water when its temperature is decreased. What relationship do you expect to find between temperature and volume? What
convert 0.105mg to kg
A fur dealer buys fur coats for $100 each and sells them for $200 each. He believes that the demand for coats is normally distributed with a mean of $100 and a
What's one useful strategy for reading with children around? a. Do not allow interruptions. b. Read first, attend to your child afterward. c. Do not try to
Drow to show 3 over 10
You can read it _______. This means you ________ look for any hidden meanings or symbols. A) Cautiously, must B) Figuratively, should C) Hastily, might
The difference between the maximum price a consumer is willing to pay for a product and the actual price that they do pay is known as a) Producer surplus b) Con
What are some diseases of herbaceous ornamentals? a) Root rot, leaf spot, and stem blight b) Bark beetle infestation, crown gall, and rust c) Aphid infestation,
What is the product of the reaction of halogens (Br2, Cl2) in an inert solvent (CH2Cl2) with an alkene? a) Halohydrin b) Vicinal dihalide c) Haloalkane d) Epoxi
What is a dense membrane composed of fibrous connective tissue that closely wraps all bone?A) PeriosteumB) EndosteumC) Medullary cavityD) Cortical bone