ram can do a piece of work in 8 days. He work fir 6 days and left. If hari finish as the remaining work . how much work is done by hari?​

Respuesta :

danielmaustin51
danielmaustin51 danielmaustin51
  • 25-07-2021

Answer:

Hari finished the last two days of work that ram had left behind so that means that hari did 2 days of work.

Answer Link

Otras preguntas

The perimeter of a regular pentagon is 10x + 20. Find the length of one side .
Two numbers have a difference of 4 and a sum of -8. What is their product?
What is the definition,a synonym,antonym,and sentence for the word endorse?
why was valley forge significant to the american revolutionary war victory
If x is an even number, the function f(x) = 2x − 1 gives an odd number. Identify the set of odd numbers corresponding to this set of even numbers: {0, 2, 4, 6,
Who is phillis wheatly
How do I solve the last one
the bond between which two elements is the least ionic in character? a. H-F b. H-CL c. H-I d. H-O
3. A recipe calls for 1 1/2 cups of flour, 1/8 cup of white sugar, and 3/4 cup of brown sugar. (a) How many total cups of ingredients are there? Show you
If a kite is stuck in a tree does it have potential energy or Kinetic Energy