Tayloxosupnerodine
Tayloxosupnerodine Tayloxosupnerodine
  • 17-10-2016
  • Business
contestada

The type of budget that is prepared for the expected capacity level only is called a _______. static budget. flexible budget. continuous budget. master budget.

Respuesta :

Erudite1
Erudite1 Erudite1
  • 28-10-2016
The budget that is prepared for the expected capacity level only is called a fixed or static budget.
Answer Link

Otras preguntas

the total volume of a cube is 360 inches to the third power how do you write 2 different possible sets of diminsions for the cube
explain why resolving conflict positively in the workplace is an important professional skill.
Which sentence uses punctuation correctly? A. The discovery which was the first of its kind in several years, caused an international stir. B. The discovery
What multiplies to -18 and adds to 3
Is 7/8 or 11/10 closer to 1
How do you shade to make something look 3D?
Zach bought a pair of jeans for 54$ .the next week the same jeans were 74$ what's the percent of change ?
Two right triangles on a coordinate plane are similar but not congruent.Each of the legs of both triangle are extended by 1 unit,creating two new right triangle
which of the following group of numbers are all prime numbers a.2,5,15,19 b.7,17,29,49 c.3,11,23,31 d.2,3,5,9,
________ is defined as a deliberate plan of action designed to guide government decisions. a. Sovereignty b. Constitutional c. Public policy d. Legislative