stephanie921opl stephanie921opl
  • 19-10-2020
  • Mathematics
contestada

A construction company requires 25,400 bricks
for a job. If it allows 2% more bricks for breakage, how
many bricks must it order?

Respuesta :

manimotts98
manimotts98 manimotts98
  • 19-10-2020
25,908 bricks must be ordered
Answer Link

Otras preguntas

b) Describe the impact of cutting down or burning large areas of forest on the recycling carbon. 3a) Draw a simplify labeled diagram of the nitrogen cycle to sh
pythagoras thereom ? help
Able Pads, Inc., sells plain white printer paper in a perfectly competitive market. What does its individual demand curve look like?
What is the solution of -2(x+6)+6x=4(x-3)
What is the orign of a compound microscoppe​
Open-market operations include:_______. a) repos and reverse repos. b) changes in the discount rate. c) changes in the reserve ratio. d) paying interest on exc
What are specific and comprehensive land claims
Question 4 (5 points) John Calvin believed that people could determine their place in the afterlife by the works they did on earth. True False
A bacteria population starts with bacteria and grows at a rate of bacteria per hour. How many bacteria will there be after three hours?
What is the pH of a solution made by diluting 1.00 mL of 0.10 M HCl with enough distilled water to make 1.00 L of solution?