Profit, time and performance are all basic classifications of project priorities.
a) true
b) false

Respuesta :

jepessoa
jepessoa jepessoa
  • 18-08-2020

Answer:

b) false

Explanation:

The basic classifications of project priorities are cost, time and performance. Profit is not included in the list, cost is included.

A project manager must decide how to manage the trade offs between cost, time and performance. E.g. if you want something well done and cheap, you cannot expect to have it done fast. If you want something done well and fast, it wouldn't be cheap.

Answer Link

Otras preguntas

Why can you only change 1 variable in an experiment??? #Science
what is x squared plus y squared equals nine
What similarities do nuclear energy and chemical energy share?
What is the slope of the line y= 7x - 8?
If the standard kilogram bar kept in Paris were subjected to a net force of 1 newton, what acceleration would it have as a result?
which has more volume a cube of sides measuring 4 units each or a sphere with a radius of 3 units
which has more volume a cube of sides measuring 4 units each or a sphere with a radius of 3 units
Why can you only change 1 variable in an experiment??? #Science
One reason common names are not useful to biologists is that they......A. are in Latin.B. can apply to more than one animal.C. are too long.D. require the use o
If a square room is 784 square feet what is the length of each wall