Bramble Corp. applies overhead on the basis of 200% of direct labor cost. Job No. 305 is charged with $450000 of direct materials costs and $300000 of manufacturing overhead. The total manufacturing costs for Job No. 305 is: $900000 $1050000 $750000 $1200000