mkemckayla mkemckayla
  • 19-03-2020
  • Engineering
contestada

4) How much concrete was required to make the Hoover
Dam? Where did this concrete come from?

Respuesta :

Аноним Аноним
  • 02-11-2020

Answer:

Three and one-quarter million cubic yards.The initial concrete required for the dam was mixed in a river-level mixing plant which was located approximately 3/4 of a mile upriver from the dam site This plant provided the concrete for the linings in the diversion tunnels and for the lower levels of the dam. It went into operation on March 3, 1932.

Explanation:

Answer Link

Otras preguntas

Find the product. 3 2/5 x 5/3 A. 2 B. 17/3 C. 3/17 D. 81/25
100 is 86% of what number
Given that the population of quarters has a mean weight of 5.67g and standard deviation of 1.34g, what do you know about the mean of the sample mean
Sesame uses ____________________ key encryption to distribute secret keys.
what is f(2) for the function f(x)=4x=1?
who invaded the indus valley in 326 BC
Given that the population of quarters has a mean weight of 5.67g and standard deviation of 1.34g, what do you know about the mean of the sample mean
What is 156,556 divided by 70?
verify sinx/1-cosx + sinx/1+cosx = 2cscx
What is the ratio of 6/4 in simplest form??