eliezersanchez321 eliezersanchez321
  • 19-03-2020
  • Computers and Technology
contestada

Hi Eliezer, when you submit this form, the owner will be able to see your name and email address.
1. List the three main phases of program development.
Enter your answer

Respuesta :

problemsolver2019
problemsolver2019 problemsolver2019
  • 26-03-2020

Answer:

  1. requirement analysis: here problem understanding
  2. Flow chart/ pseudo code collection
  3. coding
  4. Debugging
  5. Testing results
  6. Updating if the error is found.

And three main phase are: designing, coding and testing.

Explanation:

Various steps in program development are being given here. We first analyze the problem. and then make the flow chart, and pseudo-code before writing the actual program. And rest of the steps are as mentioned above.

Answer Link

Otras preguntas

find the slope of the line through each pair of points 1. (-9,-20)(6,-15)2. (13,-2)(6,15)3. (8,6)(-2,-6)4. (-19,19)(17,7)Quick i will mark brainliest i need anw
What is special about the Mayflower Compact? What does the author mean by the title?
A copper block rests 17.4 cm from the center of a steel turntable. The coefficient of static friction between block and surface is 0.465. The turntable starts f
what moral values do you think are common among individuals all over the world?
walter pays $2.53 to ship a package
HURRY Does Hill’s suggestion of being a weekday vegetarian seem reasonable? Why or why not? Do you find his argument convincing?
what is the approximate area of a circular pond that has a radius of 35 meters?​
i need help with math please
factors that contributed to the rise of Afrikaner Nationalism between 1930 -1948​
frazers scores 75% in a spelling test with 40 questions, how many did he get right?