briarajeannette3425 briarajeannette3425
  • 20-02-2020
  • Computers and Technology
contestada

In the secure development lifecycle, how must the specific security needs of software being developed be defined?

Respuesta :

tledet24
tledet24 tledet24
  • 20-02-2020

Answer:

Requirements phase

Explanation:

Answer Link

Otras preguntas

The pencil shown below is blank cm. Long. (Be precise) The pencil shown above is blank mm.long
On a large construction project, the price of dry wall is $.40 per square foot and spraying the dry wall with textured plaster is $.45 per square yard. how much
if it has rained 2 of the last 5 days, what percent of the total days did it rain?
Identify the areas in the Chesapeake that were most desired by tobacco planters
B is the midpoint of AC and E is the midpoint of BD. If A (-9, -4), C (-1,6) and E (-4, 3), find the coordinates of D
i need the answer to this
can someone help pls?
What is the length of the unknown leg in the right triangle A. 8 cm B. 16 cm C. 20 cm D. 40 cm
WARNING~ Only For The BRAINLIESTs! QUESTION 6 “[The boy] took his money from his pouch and showed it to the young man. The owner of the bar came over and look
A normal fault is formed from compressional stress. select one: a. true b. false