A bar graph that shows what projects or tasks are in process and how much of each is completed is called a(n):
a. Gantt chart.
b. Stem chart.
c. Grid chart.
d. Priority chart.

Respuesta :

metchelle
metchelle metchelle
  • 01-07-2016
The correct answer is option A. Gantt chart. A bar graph that shows what projects or tasks are in process and how much of each is completed is called a Gantt chart. A Gantt chart is a horizontal bar graph that shows the number of work done or completed production in a certain period of time. This production tool is developed by Henry L. Gantt, an American engineer, in 1917.
Answer Link

Otras preguntas

how to use the distributive property to expand "mx(ab-b)"?
Verify the identity Cos^2x-Sin^2x=1-2sin^2x
the myelin sheath insulates an axon to decrease the rate of impulse transmission. true or false ?
Choose the two equations you would use to solve the absolute value equation below. Then solve the two equations.|x + 5| = 55
What is the simplest form of 27/42?    a.27/42  d.9/14   b.1 15/27  e.13/21   c.2/3
how many fifths are in 2 3/5
What is FOIL and PEMDAS?
Solve the absolute value equation. |x| = –15
convery decimal to fraction 0.213 0.47 0.15 0.26 1.64 1.92 then convert fraction to decimal 31/25 1/8 3/4 15/16 1/8
How do decomposers interact with their ecosystem.