contestada

Job 593 was recently completed. The following data have been recorded on its job cost sheet: Direct materials $2,472 Direct labor-hours 74 labor-hours Direct labor wage rate $ 19 per labor-hour Machine-hours 134 machine-hours The Corporation applies manufacturing overhead on the basis of machine-hours. The predetermined overhead rate is $20 per machine-hour. The total cost that would be recorded on the job cost sheet for Job 593 would be: