4 bags of cement do 18m2, how many m2 can be done with 7 bags?

Respuesta :

MrGumby
MrGumby MrGumby
  • 24-01-2019

Answer:

You would get 31.5 square meters.

Step-by-step explanation:

To find this, set up a proportion of the amount the first can make and the amount the second can. Use x for the unknown quantity.

4/18 = 7/x

Now cross multiply to solve.

7*18 = 4*x

126 = 4x

31.5 = x

Answer Link

Otras preguntas

Sofia graphed the points 1.3, −11 2 , 0.25, and 13 4 on the number line. A number line going from negative 2 to positive 2 in increments of 1. There are 2 equal
I am trying to figure this out but every type of coding I put in has errors or it states that the things aren't the same. This coding is being done in C++. Get
Which is a compound machine? a broom a screwdriver a slide a pair of scissors
Can someone please explain this and Answer it
Which of these characteristics BEST describes a difference between eukaryotic and prokaryotic cells?A Eukaryotic DNA has deoxyribose, and prokaryotic DNA has ri
An electrician charges $100 per hour for the first 40 hours that they work, time and a half for the 10 hours past 40, and double time for all hours past 50.
What are the three sections of the Great Plains region of Texas?
¿cuando empieza el proceso de formación de las lenguas romanicas?
create a flowchart that classifies an animal as herbivore or carnivore​
-6/15 * 4/7 - (-7)/20 * 4/7 + 3/4 PLS INCLUDE STEPS