noahdavis4837 noahdavis4837
  • 17-04-2024
  • Business
contestada

Which one is a positive risk?
1) Saving cost of project
2) Implementation of new technology that leads to a reduction in the cost of engineering
3) Loss of reputation
4) Cost overrun in project
5) Inflation in Time Material contract
6) Improve performance

Respuesta :

Otras preguntas

What object make up the solar system? what holds the solar system together?
HOW DO YOU NORMALLY TELL IF TWO THINGS CAN INTERBREED?
what reasons might Robert E. lee have given for staying in the United States army?
Why did the Southern states agree to Johnson’s plan of reconstruction?
If the researcher deems the data to be statistically significant, which of the following is true with respect to a conclusion reached? A) The researcher has st
If I have a Pentagon shape and it's 33 centimeters long, what would be my Perimeter? Need ASAP
What did Mexico's failing economy lead to??
Which policy did nazi leaders try to justify most directly with the ideas expressed in the excerpt?
Science is based on beliefs opinions both beliefs and opinions neither beliefs nor opinions
11. What is the difference between what is perceived and what is accurate regarding sexual activity among teenagers?