nancysmilezz4497 nancysmilezz4497
  • 20-03-2024
  • Business
contestada

The difference between budgeted amount and the actual results is called the budget ____. Select from these answers: revenue, variance, metric, or vector.
1) revenue
2) variance
3) metric
4) vector

Respuesta :

Otras preguntas

3. Who published an article in the ChicagoTimes describing the Unassigned Lands aspublic domain?​
The student found information from sources. Choose TWO pieces of evidence that support the student's claim in her essay. A. Successful video gamers must have s
What is the inverse of -2
A polygon has a perimeter of 36 inches. Each side of the polygon has exactly 12 inches long. What is the name of the polygon that is described?
equation for the line containing (4,5) and (-2,-4)
identity 3 underwater geographic physical features identified in the caribbean region
Reduce the fraction of 15/25​
what % of 1 meter is 70 meter​
Please write me an essay on diginity of labour ​
what is business? Types of business?​